Slit method - List of Manufacturers, Suppliers, Companies and Products

Slit method Product List

1~2 item / All 2 items

Displayed results

Post-construction slit method that achieves seismic reinforcement effects equivalent to a complete slit.

Obtained technical evaluation from the Japan Building Disaster Prevention Association! Earthquake-resistant reinforcement is possible while living in the home!

The "Non-Pick Method" makes previously impossible construction feasible. The "Non-Pick Method" allows for one-sided construction (partial slitting) from the exterior wall, eliminating the need to move residents, desks, chairs, equipment, and supplies, enabling construction while the building is in use! Additionally, it has obtained technical evaluation and patents from the Japan Building Disaster Prevention Association for its post-construction seismic slitting method, which has the same seismic reinforcement effect as complete slitting. 【Features】 ■ Seismic reinforcement method that does not require moving - Construction can be carried out while using the building without moving people or items! ■ High-quality slits - The finish quality and smoothness of the perforation cutting is outstanding - Fire resistance performance confirmed for 2 hours (performance test report available) ■ Significant improvement in construction environment! - Low noise, low vibration - Almost no dust dispersion (does not pollute the air around the work area) *For more details, please download the catalog or contact us.

  • Reinforcement and repair materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Sand slit method

Improving the permeable functions of grounds and turf pavement! A construction method that takes the environment into consideration by not generating excavated construction waste.

Introducing the "Sand Slit Method" by Hasegawa Sports Facilities. By using a specialized machine, we simultaneously perform minimal trench excavation and filling, which means there is no construction waste generated from excavation. Compared to conventional drainage systems, this method is completed in a short time, has lower economic burdens, and is environmentally friendly. 【Features】 ■ Improves the permeability of grounds and turf surfaces ■ Does not generate construction waste from excavation ■ Completed in a short time with lower economic burdens *For more details, please refer to the PDF document or feel free to contact us.

  • Pavement construction
  • Paving Materials
  • Paving of sidewalks, roads, parking lots and stadiums

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration